750 7th Ave. | 25th, 27th, 28th Floor Interior Fit
Turi Management Corp partnered with Fosterlane to provide a design assist and construction of 47,000 Sq. Ft. high-end interior office fit out. Turi worked with TPG to help establish budget and design of Fosterlane’s Pre-Built Standard offering to potential tenants. Turi executed the construction of the 28th floor pre-built standard for leasing and marketing. The fit out consisted of polished concrete floors with exposed ceilings in open areas and acoustical ceilings in the open office area. New office fronts, carpet, lighting, and millwork finishes were installed to demonstrate the level of sophistication for potential tenants. The 25th and 27th are being programmed.